Forklift pre-shipment inspection checklist for importers
Every ForkFocus forklift order receives a pre-delivery / pre-shipment inspection (PDI) in addition to the factory quality-control process. The inspection connects the approved order to the physical truck, its model and serial identity, mast, powertrain, tyres, attachments, options and operating condition. Loading and securing photos are normally provided; complete-truck, nameplate and functional-test photos or videos are available according to the customer requirement.

Inspection must prove the ordered unit before release
Verify that the equipment being shipped matches the approved commercial and technical scope.
The truck should be released only after the supplied unit and agreed configuration have been checked.
Verify the exact truck before shipment
The sequence is factory QC, ForkFocus PDI, requested customer photo or video evidence, customer video verification, container loading and loading/securing evidence. ForkFocus arranges this verification before shipment is released, but customer approval is legally mandatory only when the order terms say so.
Pre-shipment release matrix
Verify that the equipment being shipped matches the approved commercial and technical scope.
| Inspection area | What to verify | Evidence to retain | Release concern |
|---|---|---|---|
| Identity | Brand, model, serial number and ordered unit count | Complete-truck and readable nameplate/serial photos available on request, tied to the order reference | Unit cannot be matched to the order |
| Capacity and mast | Rated capacity, load centre, mast type, lift/lowered height and forks | Plate/load chart, mast measurement, fork photo | Configuration differs or capacity evidence missing |
| Power system | Engine/fuel or battery/charger/connector and destination supply | Data plates, charger label, engine or battery photos | Wrong power configuration or charger input |
| Options and attachment | Tyres, cabin, lights, hydraulics, attachment, accessories | Functional-test photos or videos available on request; agreed configuration details retained | Missing option or unverified interface |
| Documents | Manuals, certificates, packing list and agreed export documents | Document index and version | Missing or inconsistent documentation |
| Packing and loading | Protection, restraint, loose parts, labels and container condition | Container loading and final securing/reinforcement photos normally provided | Damage risk or loose/unrecorded items |
ForkFocus actual pre-shipment verification workflow
PDI is performed for every forklift order. Additional customer evidence is separated from the evidence normally provided after loading.
Order configuration confirmed
The quotation, specification, mast, powertrain, tyres, attachment, options and document scope form the inspection reference.
Factory quality control
The factory completes its own quality checks before the supplier-side verification proceeds.
ForkFocus PDI
ForkFocus arranges a pre-delivery / pre-shipment inspection for every order to check the supplied unit against the confirmed configuration.
Customer evidence on request
Complete forklift photos, nameplate photos, functional-test photos and functional-test videos can be provided according to the customer requirement.
Customer video verification
Video verification can be arranged before release so the buyer can review the truck and any agreed checks. Contractual approval authority remains governed by the order terms.
Container loading
The truck, removed assemblies, loose items and accessories are loaded according to the shipment plan.
Loading and securing evidence
Container loading and load-securing or reinforcement photos are normally provided.
Shipment release
Shipment proceeds after factory QC, PDI and the applicable customer verification steps are complete and identified discrepancies are closed.
Release, hold or escalate
The factory corrects production issues, ForkFocus or the supplier side verifies closure, and the customer can review video evidence before shipment. The order terms control any formal approval authority.
Release when…
Identity, specification, options, documents and packing match the approved order and agreed checks are complete.
Hold when…
Evidence is missing, a unit cannot be traced, an option is unclear or a document/packing issue needs correction.
Escalate when…
Capacity, mast, attachment, power system, certification or material configuration differs from the approved technical scope.
Inspection and loading evidence
Each image has a defined buyer purpose. Captions state what the image does—and does not—verify.


Watch a real pre-delivery operating test
This landscape ForkFocus video shows a 10-tonne diesel forklift being tested before delivery. A complete inspection also needs exact configuration, nameplate, functions, accessories, documents and packing evidence.
What the ForkFocus PDI must connect
PDI checks the supplied unit against the confirmed order. It does not imply third-party certification or a performance certificate unless separately agreed.
Keep inspection connected to the approved order
Compare evidence against the quotation and packing list.
Questions importers ask before shipment
Practical guidance for procurement and equipment teams.
What photos should an importer request before shipment?
ForkFocus can provide complete-truck, nameplate and functional-test photos or videos according to the customer requirement. Container loading and final securing or reinforcement photos are normally provided.
Is a running video enough for inspection?
No. It can support a functional check but does not confirm every identity, specification, document, accessory or packing requirement.
Who should approve a discrepancy?
The factory corrects production issues and ForkFocus or the supplier side verifies closure. Customer video verification can occur before release; formal approval authority remains subject to the confirmed order terms.
Should the load chart be checked?
Yes when it is part of the required truck/mast capacity evidence. It should match the delivered configuration and requested working conditions.
Verify the ordered configuration before release
Every order receives PDI. Use the approved specification to review the requested truck evidence and the normally provided loading and securing record.